Bow Echo Evolution
Slide 27 of 52
This is a generalized depiction of the evolution of a bow echo from a linear cluster of thunderstorms, or a squall line, into a fully developed bow.
Go to slide:
1: THE LABOR DAY 1998 DERECHO
2: THE LABOR DAY 1998 DERECHO
3: EVENT OVERVIEW
4: Damage Photos
5: HISTORICAL PERSPECTIVE
6: Post 1AM Severe Weather Reports
7: July 15, 1995
8: SYNOPTIC OVERVIEW
9: 12Z September 6th Surface Analysis
10: 12Z BUF (red/green) / PIT(blue) Skew-t
11: 12Z 850mb
12: 12Z Surface Plot
13: 12Z 250 mb
14: 15Z Surface Plot
15: 18Z Surface Plot
16: 21Z Surface Plot
17: 00Z 850 mb
18: 00Z BUF Skew-t
19: 12/00Z BUF Skew-t
20: 00Z Surface Plot
21: 00Z 250 mb (12-hr Eta forecast)
22: 00Z 250 mb Divergence
23: 03Z Surface Plot / BUF radar
24: 05Z Surface Divergence
25: 06Z 250 mb (18-hr Eta Forecast)
26: CONCEPTUAL MODELS
27: Bow Echo Evolution
28: Fujita Bow Echo Morphology
29: Radar Loop - July 15, 1995
30: HP Supercell to Bow Echo Evolution
31: BUF Radar - 0321Z
32: STORM EVOLUTION
33: BUF RADAR LOOP
34: BGM RADAR REFLECTIVITY LOOP
35: BGM RADAR VELOCITY LOOP
36: A GLIMPSE AT THE FUTURE
37: A GLIMPSE AT THE FUTURE
38: Eta Precip Forecast 00-06Z
39: Eta Precip Forecast - 06-12Z
40: MM5 at NWS Binghamton
41: MM5 Terrain - 20 km grid
42: Modeling the Labor Day Derecho
43: Observed Rainfall Totals
44: MM5 Run - Real-Time Configuration
45: 0430Z Radar/04-05Z Precip Real-time Run
46: MM5 Sensitivity Runs
47: MM5 Sensitivity Runs
48: Betts-Miller - 04Z Radar/04-05Z Precip
49: Betts-Miller - 05Z Radar/05-06Z Precip
50: Betts-Miller - 06Z Radar/06-07Z Precip
51: Observed and Betts-Miller 00-12Z Precip
52: MM5 Simulations - Summary